Worksheets for training and practical use · Editorial revision 3.1 · Calculation model 3.0 · EnableAI
How to use the cards
Create a copy for each project and each independent benefit or activity. Record the answer in natural units before converting it to points. A blank field means unresolved; zero requires an explanation. Keep dated approvals and a change log. These templates are EnableAI's own working tools. They support principles of explicit criteria, documentation, and follow-up from MCDA and GAO; they are not templates supplied by those sources.
Card A: Project and decision
| Field | Questions and records |
|---|---|
| Identity | Project ID, title, decision ID, date, model profile, and current phase |
| Problem | Which workflow is inadequate, for whom, and with what consequence? |
| Alternative | What happens without the project? What simpler change is possible? |
| Scope | What is included, what is excluded, and what dependencies exist? |
| Measurement period | Adoption date, benefits in the first 90 days, and any lifecycle analysis |
| Accountability | Accountable business owner, project manager, estimating leads, and decision-maker |
| Requirements | Mandatory quality, safety, and other acceptance criteria |
| Decision | Which next step needs funding, and what uncertainty should it resolve? |
Card B: From questions to VP
| Field | What needs documenting? |
|---|---|
| Benefit ID | For example, V-P1-D1-01; link to the project and criterion |
| Claim | The original expected outcome in the accountable owner's own words |
| Specific indicator | Unit, direction, definition, and any segment |
| Baseline | Level, period, number of observations, source, and selection method |
| No-project alternative | Expected trend and concurrent changes |
| Input | Volume, adoption, benefit per unit, and any realizable share |
| Input status | Observed, calculated, based on a comparable example, or an expert assumption |
| Raw improvement | Formula and result in the natural unit; low/central/high |
| VP | Reference, weight, formula, and result; direct/indirect subtotal |
| Overlap | Is the same time, customer, incident, or opportunity counted in another benefit? |
| Verification | Measurement method, timing, measurement owner, and access to evidence |
| Decision rule | Minimum, relative and absolute tolerance, and mandatory requirements |
Completed example: capacity put to use
Benefit V-TR1-D1-01. Problem: lengthy active handling of relevant standard cases. Expected volume is 8,000 cases over 90 days; usage is 75%; gross savings are four minutes with one minute of extra review; 60% of net time is allocated to planned customer work. The raw improvement is 8,000 × 0.75 × (4 − 1) / 60 × 0.60 = 180 hours. With a reference of 600 and weight of 15, D1 is 4.5 VP.
Document volume with a dated case extract, net time with a comparable trial, and usage share with a measured user cohort. The realizable share requires the accountable owner's capacity plan. Until evidence is available, record the figures as assumptions. The same capacity is not also a cash saving. This example uses training data.
Card C: From activity to K
| Field | What needs documenting? |
|---|---|
| Activity ID | Project, phase, and independent deliverable |
| Scope | What will be completed, and what is already included elsewhere? |
| Quantity | Number of cases, meetings, participants, groups, integrations, or other units |
| Time or price per unit | Data source, validity, and low/central/high estimate |
| Internal hours | Quantity × time; all participants' time, including preparation and follow-up |
| External purchases | Amount, currency, conversion, price index, quote, and payment timing |
| Phase allocation | Next phase and remaining later phases |
| Base estimate | Hours × the internal reference hourly rate + external purchases in reference USD |
| Owner and acceptance | Who estimates it, and what demonstrates that the work is complete? |
Completed example: training
30 employees × 2 hours = 60 hours. An internal coordinator spends 10 hours. An external instructor charges approximately $1,800. Training therefore requires 70 internal hours plus approximately $1,800 externally; K is approximately $8,150 in reference resources and 2.40 SE at a price index of 1.00. The external instructor’s hours are not internal hours. Add a separate technical deliverable of 75 hours, and the full example requires 145 internal hours, approximately $14,900 in reference resources, and 4.40 SE.
Card D: Named risks and residual uncertainty
| Field | Question |
|---|---|
| Risk ID | Which cause could trigger which event, and within what period? |
| Probability | What history or expert assessment supports the figure? |
| Consequence | How many additional hours and purchases would the event require? |
| Overlap with the base estimate | What is already in K, including approved preventive work? |
| Connection to VP | Does a benefit also decrease, and where is that recorded? |
| R | Probability × additional resource use at reference rates |
| Owner and trigger | Who monitors the risk, and what triggers action? |
| Scope of U | Which other activities still have uncovered uncertainty? |
| Basis for U | Exposed base estimate, history or assumption, allowance, and overlap check |
| Investigation | Which test could reduce or reclassify the uncertainty? |
Card E: Phase follow-up and decision
| Field | Record |
|---|---|
| Approved baseline | Date, scope, profile, VP, K/R/U, remaining SE, and phase estimate |
| Actual benefit | Same indicator, same unit, source, and observation period |
| Actual effort | Hours and purchases on a common price basis |
| Scope change | Approved change ID and separate effort; forgotten work is an estimation error |
| Variances | Raw and adjusted size errors, plus value error measured against the improvement |
| Interpretation | Is the estimate accurate? Is the benefit sufficient? Are requirements met? |
| New forecast | Updated VP and remaining SE; retain the old figures |
| Decision | Stop, adjust, investigate, or continue; owner, date, and conditions |
Transferring data to the existing spreadsheet
Project Cards receives Card A. Value receives raw improvements from Card B; Calibration contains references and weights. Resources and Risks receive totals from Cards C–D. Size combines K/R/U. Phase Follow-up and Measurement Points receive Card E. Realized and Actual Value show the final outcome.
The spreadsheet has 12 project slots, three decisions per project, 16 resource rows, and three risk rows per decision. Cards may contain more detail than the sheet; aggregate it with a documented mapping. Additional risks need a clearly linked sublog or a controlled extension of the sheet. No risk should disappear just because only three rows are visible.
The spreadsheet does not replace the evidence archive. Save scorecards and sources with stable IDs. Cards can live in a document, an approved collaboration tool, or a database. What matters is that a colleague can find the inputs, reproduce the figure, and see changes over time.
Use sources and cases critically
Morgan Stanley illustrates ongoing evaluation; it does not determine another company's benefits. Use the five project examples to practice the cards, and read VP, SE and the follow-up guide, before teaching interpretation.